BID BULLETIN NO. 1

December 05, 2019

 

Construction of Sewage Treatment Plant (STP)

for the Isolation/ Holding Area Facility

IB NO. 2019-17

This Bid Bulletin is being issued to amend the schedule of bid opening and deadline of submission of bids and to clarify the issues and concerns raised during the Pre-Bid Conference held on November 29, 2019; 10:00 AM at the Bureau of Quarantine.

 

This Bid Bulletin will form an integral part of the bidding documents for the Construction of Sewage Treatment Plant (STP) for the Isolation/Holding Area Facility.

 

Invitation to Bid

 

  1. Bids must be duly received by the BAC Secretariat at the address below on or before December 13, 2019, 10:00 AM. All bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in ITB Clause 18.

Bid opening shall be on December 13, 2019, 10:00 AM at Mini-Conference Room, 2nd Floor BOQ Main Building, 25th and A.C Delgado Sts., Port Area Manila.  Bids will be opened in the presence of the bidders’ representatives who choose to attend at the address below. Late bids shall not be accepted.

 

Bill of Quantities

Construction of Sewage Treatment Plant

of Isolation/Holding Area Facility Phase II

NAIA Road, Pasay City

 

Item No. DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
(PESOS) (PESOS)
(1) (2) (3) (4) (5) (6)
           
A Permits / Electromechanical /Sanitary Works        
A.1 General Requirements        
a.1.1 Temporary facilities 1.00 lot   0
a.1.2 Project Billboards/signboards 1.00 lot   0
a.1.3 Permits and clearances 1.00 lot   0
           
A.2 Equipment, pipes and fittings        
a.2.1 STP Equipment        
  Ozone Generator 20g/hr 8.00 sets   0
  Multimedia Filters 24x 72 5.00 sets   0
  Pumps  1.5hp 7.00 pcs   0
a.2.2 Plumbing pipes and fittings        
  UPVC Pipes and fittings Gray 60.00 Lm   0
  Solvent cement 20.00 pcs   0
a.2.3 Electrical pipes, fittings and Controller        
  EMT pipes and fittings 1.00 lot   0
  Wires 1.00 lot   0
  STP Controller (Complete w/ OVUV, TOR, CB, MC, FUSE, 1.00 assy   0
  Pilot light, push button in nema 4)        
a.2.4 Brackets and Support        
  Angle bars 33.00 pcs   0
  u bolts 100.00 pcs   0
  grip anchor bolt 50.00 pcs   0
           
A.3 Complete Plumbing & Sanitary Works        
a.3.1 Transfer, Process, and Discharge Sytem        
  Sanitary pipes and fittings 38.00 Lm   0
a.3.2 Influent, Effluent over flow sewage pipe        
  Sanitary pipes and fittings 18.00 Lm   0
           
A.4 Testing and Commissioning        
a.4.1 System Process        
  Power/Electricity 720.00 kwh   0
           
B Civil Works Phase        
B.1 Layout of STP pump Room and Chamber        
b.1.1 Excavation 1.00 lot   0
b.1.2 Backfilling 1.00 lot   0
           
B.2 Construction of STP Chamber and pump Room        
b.2.1 Formworks        
  Phenolic Board 44.00 pcs   0
  Coco Lumber formworks 866.00 bd ft   0
  Coco lumber scaffoldings 1205.00 bd ft   0
  Common Nails 25.00 kg   0
b.2.2 Rebar        
  16mm dia rebar 516.00 kg   0
  12mm dia rebar 591.00 kg   0
  GI wire 10.00 kg   0
b.2.3 Concrete Pouring        
  Cement 441.00 bags   0
  Gravel 36.75 cum   0
  sand 18.375 cum   0
b.2.4 Water Proofing        
  Integral water proofing 252.00 sqm   0
  Water stop Bentonite 36.00 Lm   0
b.2.5 Painting works        
  Elastomeric Paint 4.00 Gals   0
  Skimcoat 5.00 bags   0
  Sand Paper 10.00 Lm   0
  Brush/roller 3.00 pcs   0
           
C Others        
C.1 Application of Dischare permits/LLDA Permits        
  Application of Discharge permits 1.00 lot   0
  LLDA Clearance 1.00 lot   0
C.2 Training 1.00 lot   0
           
           
           
  GRAND TOTAL       0
           
  GRAND TOTAL (in words)        

 

 

         For guidance and information of all concerned.                                                          

 

 

      ALEXANDER M. OBA, MD, MPH

     Chairperson, Bids and Awards Committee

 

<-Download Bid Bulletin Here->